1. If 65 square feet of copper flashing is needed for a
particular job and 20% is to be added for waste, how much should be ordered?
2. The total cost of building a house is $146,000. What
percentage is spent on excavation, foundation, and framing if these costs are
$72,275?
Leave a Reply